Project

The Think on Top of the Box project saw the conversion of an existing three storey concrete frame building into nine high-quality, modern townhouses.

The Think on Top of the Box project saw the conversion of an existing three storey concrete frame building into nine high-quality, modern townhouses. Frameclad were appointed to supply the SFS infill to form new external walls to the existing levels. The project also required the installation of a brand new self-supporting top storey using a steel frame system to increase the total floor space.

Located in a coastal area, this conversion from concrete frame building into exquisite riverside townhouses outlined strict specifications that required precision and expert delivery. A Frameclad steel frame system (SFS) was the ideal choice for the development.

  • SITE: Coastal Location

  • MATERIALS 70mm, 150mm and 200mm sections

  • AREA: 2000m²

  • FLOORS: 3

  • STATUS: Complete

More projects

  • Una remodelación desafiante en Northampton requirió la experiencia, la resiliencia y la adaptabilidad del equipo de Frameclad para entregar 40 nuevos apartamentos familiares.

  • Este projeto é um excelente exemplo de como a estrutura de aço leve de suporte de carga pode ser usada com grande efeito em habitações residenciais.

Crafting the high quality products you can trust. Serving you better since 1995!