Project

This prestigious project involved a full refurbishment of a reinforced concrete structure. Frameclad provided innovative light steel framing solutions to overcome the challenges of this development and deliver high quality results. The towering structure was transformed from commercial block to 439 residential units with 46 car parking spaces.

Towering over the North Circular, the Wembley Point building is an imposing sight on the skyline. Once an ageing, concrete frame office block from the 1960s, now an impressive, modern apartment complex with a striking cladding design.

  • PRODUCT: Stud and Track and floor infil section

  • MAIN CONTRACTOR: Buildtherm

  • MATERIALS: 75mm,100mm and 150mm

  • AREA: 8000m²

  • FLOORS: 20 floors

  • STATUS: On site

More projects

  • O desenvolvedor precisava de uma alternativa à estrutura de madeira para evitar atrasos dispendiosos e aumento dos custos no local, a estrutura de aço leve foi a solução.

  • Frameclad fue elegido por el contratista principal para proporcionar soluciones de marcos de acero ligero para el desarrollo de Goods Corner en Edimburgo.

Crafting the high quality products you can trust. Serving you better since 1995!